Skip to content

WSJF Calculator

Weighted Shortest Job First: (Business Value + Time Criticality + Risk Reduction/Opportunity Enablement) ÷ Job Size, each part sized against the others on 1, 2, 3, 5, 8, 13, 20.

How this works

Weighted Shortest Job First ranks work by its cost of delay divided by its size, so small, urgent, valuable items rise to the top.

When to use it

  • Prioritizing features or epics, especially in SAFe.
  • When several stakeholders disagree on what comes first.

How to run it

  1. Add each feature by its Feature title. A title alone is enough: it waits in Score by column.
  2. Press Score by column and pick a column (BV, TC, RR/OE or Size). Find the smallest feature and give it a 1, then size the others against it on 1, 2, 3, 5, 8, 13, 20.
  3. Use Next column until all four are done. Each pick saves at once, and a feature's WSJF shows once its four parts are set.
  4. Or score all four in the add form, and change them later with Edit on the row.
  5. The list ranks by WSJF = cost of delay ÷ job size, where cost of delay = business value + time criticality + RR/OE. Re-sort catches the order up after edits.

Relative scores (modified Fibonacci)

1
smallest in the set
3–8
in between
13–20
largest in the set

Tips

  • If a column has no 1, the tool says so: relative scores only work against the smallest item.
  • Linked rows read and write the backlog item, so the Backlog Prioritizer shows the same WSJF.

Add feature

Score each item against the others: 1 is the smallest in the set, 3 to 8 in between, 13 and 20 the largest. Or add titles only and score each column across every feature below.

Value to users or the business, against the other items.

How fast the value drops if it waits.

Risk it removes or options it opens.

Work it takes, relative to the others.

Amr, waiting
No features yet. Add one above (a title is enough to score it column by column), or load an example.