MoSCoW Matrix

Bucket scope into Must / Should / Could / Won't to align cross-functional teams on what's in vs out, with Musts kept to about 60% of the planned effort.

How this works

MoSCoW sorts scope into Must have, Should have, Could have and Won't have (this time), and keeps the Musts to about 60% of the planned effort.

When to use it

  • Agreeing the scope of a release, MVP or fixed-date project.
  • When stakeholders treat everything as top priority.

How to run it

  1. Agree the release or timebox you're scoping. MoSCoW only works against a deadline.
  2. Type the Scope item, pick its Bucket (none is picked for you) and, if you like, an Effort in points, then click Add.
  3. Challenge every Must have: would the release fail without it? Use Move on a row to change its bucket. Items without one wait under Not sorted yet: use Sort to file them.
  4. Watch the Must budget: the Musts' share of the planned Must + Should + Could effort, against a marker at 60% (Won't is left out). Over the limit, it says how much Must effort to move down.
  5. A row linked to the backlog uses the item's job size as its effort, and a move writes to the backlog item too.

Buckets

Must have
without it the release fails, is unsafe or not allowed
Should have
important, but there's a workaround
Could have
nice to have; first to drop if time runs short
Won't have (this time)
agreed out of scope for now

Tips

  • The budget shows once three planned items have an effort.
  • Won't have means not this time, not never: keep those items on the board and revisit them next release.
  • To order items inside a bucket, score them in the WSJF Calculator or RICE Scoring Calculator.

Add scope item

Must: the release fails without it. Won't: agreed out of scope this time.

For the Must budget, when the item isn't on the backlog (the backlog's job size counts when it is).

Amr, waiting
Nothing sorted yet. Add a scope item above, or load an example release.