Refinement Checklist

Walk the backlog stories that aren't ready yet: tick the Definition of Ready, queue unsized ones for Planning Poker, and mark them ready for Sprint Planning.

How this works

A Definition of Ready is a short list of checks a story must pass before the team takes it into a sprint. This page walks the stories that aren't ready yet against it, sends unsized ones to Planning Poker and marks the rest ready for Sprint Planning.

When to use it

  • In backlog refinement, to get the next sprint's stories ready before planning.
  • When stories often stall mid-sprint because details, designs or dependencies were missing.
  • When the Sprint Cockpit's Refine the backlog card shows stories to size.

How to run it

  1. Agree your Definition of Ready as a team: in its card, edit or delete the criteria, or add one with Add criterion.
  2. Under Refinement session, go through the stories with Previous story and Next story, or pick one from the list. Needs points shows only the unsized ones.
  3. Read the story's acceptance criteria beside the ticks. Add details or Edit details changes them, its notes, ticket key and link.
  4. Tick each criterion the story meets. Mark ready needs every criterion ticked and some points; Save checks keeps the ticks to come back to.
  5. For a story without points, click Queue for Poker, or Queue N unsized for Planning Poker to send them all, then Open Planning Poker.
  6. Ready stories move to the Ready list; use Re-check if something changed. Plan the sprint with the ready stories opens Sprint Planning.
  7. To check a story that isn't on the backlog, use Check a story by name under Earlier checks, then Add to backlog.

Readiness

Ready
marked ready: every criterion met and the story has points
Ready once sized
every criterion is met, but no points yet
Partial
some or all criteria met, not marked ready yet
Not ready
no criteria are met yet
Not checked
not checked against the list yet

Tips

  • Keep the list short, around 5–8 checks: a long one becomes a gate that slows the team down.
  • Check the story asks the six INVEST questions and lists five ways to split a story that is too big. Its ticks aren't saved.
  • The bin deletes the story, with Undo. In a running sprint it can only leave the sprint, and a story that was in a running or closed sprint stays.
  • The pass-rate trend is under Advanced analysis, once enough checks are saved.
  • Reset checklist restores the default criteria and clears the earlier checks, with Undo. Readiness saved on stories stays.

Backlog readiness

Loading the backlog…

Definition of Ready

  1. User story written in correct format (As a / I want / So that)

  2. Acceptance criteria defined

  3. Estimated by team

  4. Dependencies identified

  5. No unresolved blockers

  6. UI/UX mockups attached (if applicable)

  7. Technical approach discussed

  8. Story fits within one sprint

Optional: what counts as passing.

Earlier checks

No earlier checks. Stories in the backlog are checked in the session above; check one that isn’t there by name.

Advanced analysis: pass-rate trend

Definition of Ready pass rate

Check 6 more stories to see the pass-rate trend.