Cumulative Flow Diagram
See how work flows through your stages, from your Sprint or Flow board: widening bands are bottlenecks.
How this works
A cumulative flow diagram stacks how many items sat in each stage, day by day. It builds itself from your Sprint board's or Flow board's moves, and a band that keeps widening is work piling up in that stage.
A cumulative flow diagram stacks how many items sat in each stage, day by day. It builds itself from your Sprint board's or Flow board's moves, and a band that keeps widening is work piling up in that stage.
When to use it
- Checking whether work flows smoothly or piles up in one stage, such as Review.
- When work keeps starting but little finishes, before a Daily Scrum or a retro.
- Tracking a board the toolkit can't read, with snapshots typed by hand.
How to run it
- With nothing to chart yet, Load an example shows a sample Sprint board without saving anything, or click Type snapshots instead.
- Under Chart from, pick Sprint board (and the sprint), Flow board (and the Last 14, 30 or 90 days) or Typed snapshots. It starts on the Sprint board if the sprint has stories, else the Flow board.
- Read the sentence above the tiles. It names a widening band first, then a stall (work in progress but nothing finished in the last 3 days or snapshots), else steady flow.
- The tiles show Work in progress against the limit, Throughput (items finished a day) and Lead time (Little's Law), average WIP ÷ throughput. On a board, its Measured line gives the real cycle time once 3 items have finished.
- For a board the toolkit can't read, choose Typed snapshots. Under Add a snapshot, pick the Date (backdating is fine), type a count for every column and click Add snapshot. Done is a running total.
- Edit dates, counts and notes in the Snapshots table, or delete a snapshot with Undo. Under Status columns, rename, add (it goes before Done) or remove a column, also with Undo. Set a limit under WIP limit (optional).
- Open Advanced analysis: WIP control chart and trend for control limits and change points. Export gives the daily counts as Markdown or CSV.
Tips
- Throughput and lead time appear from 3 days or snapshots; the WIP trend needs 6 and the control chart 8.
- On a board, the WIP limit is In progress and Review together, set on the Kanban board. Over the limit, the page says to finish something before pulling more in.
- In typed snapshots the first column is waiting work, the last is done and the ones between are work in progress, so keep at least three.
- Clear snapshots asks first and offers Undo. The snapshots and the WIP limit go; your columns stay.
- For the spread of how long items take, not just the average, use Cycle Time.