DORA Scorecard
The four DORA metrics quarter by quarter, banded by the 2023 State of DevOps Report.
How this works
DORA's four key metrics measure software delivery: deploy frequency and lead time for speed, change failure rate and time to restore for stability. The scorecard keeps one sample per quarter, banded Elite, High, Medium or Low by the 2023 Accelerate State of DevOps Report.
DORA's four key metrics measure software delivery: deploy frequency and lead time for speed, change failure rate and time to restore for stability. The scorecard keeps one sample per quarter, banded Elite, High, Medium or Low by the 2023 Accelerate State of DevOps Report.
When to use it
- Quarterly engineering reviews, to see whether delivery is getting faster and safer.
- Before and after a big change, such as a new CI/CD pipeline, to check its effect.
How to run it
- Under Log a quarter, pick the Quarter: it starts on the latest finished quarter without a sample, and logged ones are marked. On an empty page, Load an example shows six quarters (not saved).
- Click Fill from your data to work the four numbers out from Release Readiness (deploys, rollbacks), the Sprint and Flow boards (lead time) and Incident Commander (time to restore). A metric it can't give stays empty, with why and a link.
- Check or type Deploys a week, Lead time (hours), Change failure rate (%) and Time to restore (hours), add what changed this quarter, and click Save quarter.
- The sentence names the latest quarter's weakest metric; the tiles show each band, and How they're set gives the ranges. Trend across quarters charts each metric from two quarters.
- Fix a quarter with the pencil on its row (Refill from your data works it out again). The bin deletes it with Undo; Clear all samples asks first, then offers Undo.
- Export it as Markdown or CSV, then agree one improvement to the weakest metric for next quarter.
Bands, 2023 report (deploys · lead time · change failure · restore)
- Elite
- 7+ a week · up to 1 day · up to 5% · up to 1 h
- High
- 1+ a week · up to 1 week · up to 10% · up to 1 day
- Medium
- monthly or more · up to 30 days · up to 15% · up to 1 week
- Low
- rarer than monthly · over 30 days · over 15% · over 1 week
Tips
- Read all four together: shipping faster while change failures climb isn't progress.
- Filled lead time runs from the start of work to the release that shipped it, the nearest the boards get to DORA's commit. It needs 3 items for a median.
- A quarter saved while it runs is marked In progress, then Partial quarter: edit it once it ends.
- Keep definitions the same every quarter. Advanced analysis adds trend tests from 6 quarters and control limits from 8.
Loading the scorecard…