Burndown Generator
Track sprint progress with ideal vs. actual remaining points, today marker, and scope change annotations.
How this works
A burndown shows the points left in the sprint each day against an ideal line that only burns on the team's working days. The numbers come from the sprint board, or from a typed daily log when the stories have no points.
A burndown shows the points left in the sprint each day against an ideal line that only burns on the team's working days. The numbers come from the sprint board, or from a typed daily log when the stories have no points.
When to use it
- Checking each day, before the Daily Scrum, whether the sprint is on track.
- Spotting early that work has stalled or scope has joined, while there's time to act.
- Looking back at a closed sprint in the Sprint Review or the retro.
How to run it
- Pick the sprint under Sprint, or click New sprint. Burnup, Velocity, Sprint Metrics and the Sprint cockpit follow the same choice. No sprints yet? Click Create your first sprint, or Load an example for a read-only preview.
- Read the sentence at the top: the day of the sprint, points done of the current scope, how far ahead or behind the ideal line, and when it finishes at this pace.
- Read the tiles: Remaining, Pace vs ideal, Done (as a % of the current scope) and Projected finish.
- With pointed stories the badge reads From the sprint board: use Move stories on the sprint board to update it. A story moved to Done counts that day; one added or taken out mid-sprint moves the scope, not the burn. Daily progress lists each day, with a note you can add.
- With no pointed stories, type the Points remaining each day in the Daily log, and press Mark change on a day work was added. While the board has points the log waits under Daily log (fallback); when both hold numbers, switch with From the board and From the typed log.
- The bin clears a day, and Clear log (it asks first) clears them all. Undo brings either back. Sprint settings changes the Planned points, Length (days) and First day for every sprint tool.
- Export gives Markdown, CSV or PNG. Next step under the tool may suggest closing an ended sprint, estimating unsized stories or talking through a gap at the Daily Scrum.
Tips
- The ideal line counts working days only, so it stays flat on the shaded weekends and holidays.
- Can't tell yet means every pointed story is done but open stories have no points. Estimate them in Planning Poker.
- A closed sprint shows its typed log, as it was recorded; with no log it is rebuilt from the stories' sprint moves.
- Advanced analysis needs 4 working days for a forecast and 8 for pace shifts. Day 0 counts.
- A flat line for several days usually means work is too big or blocked.
Loading sprints…