Skip to content

Backlog Health

Check the backlog is DEEP: detailed near the top, estimated, emergent and prioritized.

How this works

Backlog Health checks whether your backlog is DEEP: detailed enough near the top, estimated, emergent and prioritized. It flags vague, unsized and stale stories, suggests splits and helps write acceptance criteria as Given, When, Then.

When to use it

  • Before refinement, to choose the stories that need the team's time.
  • Before Sprint Planning, to check the top of the backlog can be pulled in.
  • When the backlog has grown so long that nobody trusts it.

Timebox: Ten minutes before each refinement.

How to run it

  1. Open it: it reads the stories and backlog items you already have, so there's nothing to type.
  2. Read each of the four DEEP checks and the stories behind its flags: a vague title, no points or no acceptance criteria near the top, too big, or stale (not changed for weeks). Stories that share a place in the order show in the Prioritized check.
  3. Open a flagged story to fix it: give it points, split it with a suggested pattern, or write its criteria as Given, When, Then. Each line is saved on the story, beside its free-text acceptance criteria.
  4. Drop stale stories, with Undo, or refine them: a change to the title, points or criteria counts as touching them.
  5. Ask Amr flags vague stories, suggests splits and drafts Given, When, Then lines. You accept the ones you want, and each change goes through the story with Undo.

Tips

  • Only the top of the backlog needs detail; stories further down can stay rough.
  • A long tail of stale items is a decision waiting to be made, usually to drop them.

Loading your backlog…